what is the compressive strength of concrete cube of ratio 1:6:12?..

Answer / shreedhr.k

2.5N/mm2, it is M2.5 GRADE CONCRETE

Is This Answer Correct ?    8 Yes 1 No

what is the compressive strength of concrete cube of ratio 1:6:12?..

Answer / nadim shaikh

M 2.50N/mm2 or M25kN/cm2
God knows where its is used now a days

Is This Answer Correct ?    1 Yes 0 No

what is the compressive strength of concrete cube of ratio 1:6:12?..

Answer / arpan pal

30N/mm2(MPa)

Is This Answer Correct ?    1 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

0 Answers  


How to calculate quanty of steel in four leg stirrups?

0 Answers   INT,


how to calculate the circular beam reinforcement.its a helipad beam. Dia of bar 25 mm. if its consider any elongation?

1 Answers   Gammon,


Explain what is progress payment?

0 Answers  


what do you mean by ssd how it calculated

3 Answers  






1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

0 Answers  


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

0 Answers  


What out turn civil works

0 Answers  


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.

5 Answers   Dee Vee Projects, L&T,


what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?

15 Answers   L&T, THDC,


clear cover means the distance between main bar outer face to shuttering face. Is it right?

4 Answers  


Providing and fixing in position Tor steel to footings, foundation, slabs, beams, columns, canopies, stair case, newels, chajjas, lintels, etc. including cutting, bending, hooking the bars, binding with wires. give me the rate M.ton.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)