How to convert sqft in cft
Answers were Sorted based on User's Feedback
Answer / d.s.s.n.murty
For Example 9"th wall Quantity is 100 cft
we can convert this 100/0.75 = 133.33 sft
here 9" is width already mentioned in those situvations we
can but basically we can not convert i dont now how to ask
this one
| Is This Answer Correct ? | 21 Yes | 4 No |
Answer / s.prabhu
Please correct yopur question it should either
1) Sqft in to Sqmt
or
2) Cft in to Cum
Please correct...........
any clarification
please contact
S.Prabhu
9901702081
| Is This Answer Correct ? | 16 Yes | 3 No |
Answer / sachin sagar
It is twist of mind quastion bcz area could not convert volume without it is correct L X B X H = Volume
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / basheer
please multiple sft with length or width.
Area =sft, volume=cft.
Area =b×d,
volume =l×b×d.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / itishree mohanty
here is the formula:
(cubic feet) = (square feet) × (height in feet)
Or for meters:
(cubic meters) = (square meters) × (height in meters)
| Is This Answer Correct ? | 6 Yes | 10 No |
Answer / ayush sharma
to convert sqft into cuft
divide the factor with 10.76
| Is This Answer Correct ? | 3 Yes | 11 No |
Answer / k bu. babu
one cu.m=35.28 cu.ft
1 cu.m = 10.76 sq.ft=35.28 cu.ft
1 sq.ft=(35.28/10.76)=3.28 cu.ft
| Is This Answer Correct ? | 12 Yes | 32 No |
How much quantity of cement,sand,stone used to build 1 cum of cc road??
0 Answers Pandey Construction Company,
how many nos of National highway in India.
13 Answers HBC, L&T,
States some of the commonly used commands in cad software’s?
number of standard bricks need 1 cubic meter
what will be the cement and sand needed for 1sqm plastering ? for ratio 1:6 and 10mm thick
when we select buildup beam
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm
What in your past experience or education prepares you for the position for which you are applying
how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3
0 Answers Ajnara Group, Assosa University,
how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
what do u mean by elongation & flakiness of aggregate?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)