Which code specifies the specification ofthe construction
joints to be provided in the raft slab of a basement which
is 6 m deep.what should bethe detail of such a joint?
No Answer is Posted For this Question
Be the First to Post Answer
how many kg sand is requried for plastring in 100 sqft?
how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars
what is the constant weight of the 6mm,8mm,10mm,12mm,20mm,25mm etc.............dia bars in 1meter
what is idealized curve for concrere and steel
What is quantity of cement and sand required for 2000sqft of tiling?
What is the usage of zoom command?
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
what is thumb rule for calculating the size of ISMB required for a particular length of span
cement quantity in 1 M3 pcc
Please tell me the difference between nominal and clear cover. Thanks.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)