Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answer Posted / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Slump Values for works?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is the list of building construction equipment & teir output?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
undistributed samples are obtained by
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
If specific gravity of cement is less than 3.15 what is the cause?
how to clculate the %of concrete strenght achive after curing?load
how i convert mm into standard wire guage (SWG)no.
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
How are freeway bridges built?
how to determine H- zone in a column? where it will occur?
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
give me the rate analysis for Bituminous Macadam and SDBC