Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answer Posted / karthik rajendren
3% for Concrete & rebar
5% for Brick/Block Work,Plaster& Tile
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
is basic cost of the material includes tax?
how can calculate the compressive strength of concrete cylinder by water cement ratio ?
How to cal. The weight of hollow pipe?
what is the weight of 6000 psi concrete in lb/cft?
What are the advantages of cad?
How to do base isolation for RC framed structure using ETABS software?
What is the difference between Fe 500, Fe 500 D and Fe 515.
Advantage of Aluminum form work in terms of activities can be skip and cost too
What are the applications of modulus of elasticity?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
how much tempareture are required to make liquid state of pid leed
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
how to calculate the steel in 500yard