Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answer Posted / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What materials were used to build the golden gate bridge?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
how many material required for brickbat water proofing of toilets.
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
acceptance criteria for concrete works
detailed calculation of the amount of cement used?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
What are the uses of layer?
dialation means
What should be the standard roof height like to be?
how many types of survey and what are levelling instrument?
what is the specific gravity of rubble in plum concert
Explain major differences between routing maintenance and major maintenance.