1. how Product Cost Collector Works?
2. What are the master data for MRP?
3. In a production order without making goods issue, i should
not be able to do goods receipt. How do we do it?
4. i have one particular part 'A'. it is available in two
storage location X & Y. when i run MRP, I don't want MRP to
consider stock that are available in storage location Y. what
should be done.
5. for in-house production, planned order are generated & for
external procurement purchase requisition. i want, system will
go in external procurement to a particular vendor. what is the
setting?
6. what are the problems you faced in MRP?
Answers were Sorted based on User's Feedback
Answer / dheeraj
1. Product Cost COllector is created with using T-code KKF6N.
Production cost collector is created for the production version so that it can calsulate cost for that material on the basis of Production version (BOM + Routing)
2. Master data for MRP- Material Master
3. Just confirm your order and delete all the rows of good issue and just post only 101 Movement type which is goods receipt.
4. While running MRP via T-Code MD02 set create PR as 1
Is This Answer Correct ? | 5 Yes | 5 No |
Answer / hayat khan
1. It captures all Dr and Cr related to the GR and GI for the respective material.
2. MRP controller, MRP controller for missing parts, PPC calender, Shedule margin key, MRP area, MRP type, Procurement tYPE, SPECIAL procuremement type etc
3. In confirmation parameters set indicator "termination for incorrect goods movement"
4. set MRP indicator 2 in MRP4 view for storage location Y
Is This Answer Correct ? | 0 Yes | 0 No |
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What is opening period?
What is mrp area and mrp group. tell me differences
what is standard info set? where it is used in pp?
What is MRO area & MRP group & some difference
What is Material status and which view of the material master it is available?
WHAT IS THE DIFFRENCES BETWEEN SAP R3& APO
What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.
What is alternative bom
What is meant by payscale structure? How did you configure payscale structure?
What is variant material ?
Mention what is the purpose of using capacity planning?