1. how Product Cost Collector Works?
2. What are the master data for MRP?
3. In a production order without making goods issue, i should
not be able to do goods receipt. How do we do it?
4. i have one particular part 'A'. it is available in two
storage location X & Y. when i run MRP, I don't want MRP to
consider stock that are available in storage location Y. what
should be done.
5. for in-house production, planned order are generated & for
external procurement purchase requisition. i want, system will
go in external procurement to a particular vendor. what is the
setting?
6. what are the problems you faced in MRP?
Answer Posted / dheeraj
1. Product Cost COllector is created with using T-code KKF6N.
Production cost collector is created for the production version so that it can calsulate cost for that material on the basis of Production version (BOM + Routing)
2. Master data for MRP- Material Master
3. Just confirm your order and delete all the rows of good issue and just post only 101 Movement type which is goods receipt.
4. While running MRP via T-Code MD02 set create PR as 1
| Is This Answer Correct ? | 5 Yes | 5 No |
Post New Answer View All Answers
How to move to the realization phase?
Steps to configure Production order type.
Explain LTP.
Why and how you calculate WIP?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What are dynamic actions? Give a few examples. What are it’s you used in them?
Tell one biggest task for you
Explain customer Independent requirement .
How costing is affected the pp?
What are the t-codes for creating, changing and summarizing bom?
What are the basic dates?
What is a ‘bom’?
What do we do in the realization phase?
Explain what happens to plan after it has been converted into production order?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.