What is mrp list and what is the use of it?
No Answer is Posted For this Question
Be the First to Post Answer
Define standard cost
Do you want to use one BOM to represent several similar materials (closed variant BOM)?
when we need to close the production order, before the manufacturing or after the manufacturing
what is the difference between backward scheduling and forward scheduling ?
How can you create production order without routing and BoM?
What is meant by payscale structure? How did you configure the payscale structure?
Explain LTP.
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
what is pegged requirements
What is mrp controller means?
what are the costing parameter ?
what is difference between group BOM and BOM group ?