If you are not assign components to workcenter then wt will be happen..??
What is 'mps' (master production scheduling)?
Mention what is the use of t-code cs20 in bom?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is primary cost and secondary cost?
What is significance of various manufacturing strategies?
what are the settings needed for variant configuration?
Do you have products with a large number of variants? Do you need Variant Configuration?
What is SOP and types of SOP?
what do you mean by opening periods
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Scheduling times can be defined in the material master record by?
Tell me deferent MRP types