Explain PI sheet.
Describe the change process for material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, engineering change management,revision levels, synchronization with current production orders, other.
What is planning file entry
what is the difference between backward scheduling and forward scheduling ?
What is Individual and collective requirements and differecne between them in MTO scenario?
what are the basics of PP ?
What are the steps of production execution process?
Can't one material be assigned to more than one operation in a routing?
what is backflush? what are the benefits of back flush?
How is indian slab and us slab?
What is collective order. Pre requisite of the collective order?
how to define formulas in work center
What is the output of mps run ?