We have 132KV/11KV Grid connected power transformer for
getting power from Grid. Can we use this transformer for
sending generated power as well. I mean step up from 11KV to
132KV and transmit.
Answers were Sorted based on User's Feedback
yes. because transformer is a bi directional divice
Is This Answer Correct ? | 16 Yes | 0 No |
Answer / parthi
yes, we can transmitt....because transformer working by the
mutual induction principle and we can use the transformer
upto required voltage and use step-up and step-down....
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / avnish kumar
yes we can use the said transformer to step up the power. i.e if we used a 132Kv/11KV 5Mva transformer thus we can received the power cap. 5Mva at 11Kv level, but in case of step up i.e 11Kv/132Kv the generation point is 11Kv in this case the firs generation point i.e 132Kv generation capacity should be less than the capacity generated by the 11Kv generator. but over all capacity should not be more than the capacity of transformer.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / yassir
yes we can but incase the frequency is the same for
generator and the grid.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / islander
Possible.But,In practical stage you have to see how transformer,generator and bus bar protection have configured.You will have to alter some directional type protection schemes to the bi directional.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sourabh maggo
yes exactly we can use same transformer for step up & step down applications,,
Is This Answer Correct ? | 0 Yes | 0 No |
What is Droop Control in Woodward?
What are the special criteria under which FD fans are switched off during MFT.
what is need of primary water system in power plant?
How to decide Heating surface area of boiler on their steam generating capacity?
what is actual CAL MODE & cal means?
how many safeties should be present in boiler?what are they?
4 Answers DN, Nandi, Pump Technology, Siris, Thermax,
In a thermal power plant ID Fans running with full load but boiler load is only 80 % give reason ?
9 Answers Essar, Prumatech, Tata Power,
what equipment is most efficient in power plant?
whatis means of PPA & FSA OR SFA in power plant operation
why Subcritical has 60% condenser capacity
transformer shut down process.