We have 132KV/11KV Grid connected power transformer for
getting power from Grid. Can we use this transformer for
sending generated power as well. I mean step up from 11KV to
132KV and transmit.

Answer Posted / sourabh maggo

yes exactly we can use same transformer for step up & step down applications,,

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1964


How to calculate power press toneage

1649


can dp type level transmitter work in under vaccum condition

1629


some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor

2057


What is difference between secondary Air & Tertiary Air and Their use.?

1582






procedure of how to generate power in solar plant.

1467


LAPT working in alternator / generator

2871


what does mean by kva rating

1080


what is natural frequency of turbine shaft .

1837


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1530


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

618


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

1999


How do you consider that you can improve and what assistance do you need to achieve this

1415


operation

1476


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3085