Why attempration spray is used after hp heater?
Answers were Sorted based on User's Feedback
Answer / sheik nasir hussen
Because hp heater is used to increase the FW temp which is supplied to Boiler but attemperation is used to control the o/l steam temp of boiler which is supplied to turbine.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / chinmay kumar patra
To reduce TG HEATRATE and increase efficiency.
| Is This Answer Correct ? | 5 Yes | 2 No |
Answer / meet vekaria
The outlet temperature of HP heaters should be 240 degrees and that will be inlet temperature of economiser.
the temperature limit of economizer is bounded and so we cant fed feed water more than 240 degrees in economiser.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / velmurugan
As we all know that the attemperator main purpose is to reduce the temperature of superheater steam..If we take water after feed pump or LP heater its temperature is slightly lower than the hp heater ,so there is a possibility of superheated steam condense in an attemperator itself by using lp heater or feed pump water..
| Is This Answer Correct ? | 0 Yes | 0 No |
We have 132KV/11KV Grid connected power transformer for getting power from Grid. Can we use this transformer for sending generated power as well. I mean step up from 11KV to 132KV and transmit.
Why superheated are started before I'd and rd fan?
What is LB-SR.
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
procedure of how to generate power in solar plant.
why do you consider yourself a suitable candidate for this position
0 Answers Amazon, Eskom, Nabard,
How to control cooling tower alge
1 Answers GPL, SPY Agro Industries,
which safety valve will open first if steam is not been supplied to turbine.
thermal power plants in steam using inlet of turbine.inlet of turbine pressure and flow is same as boiler feedpump why not use direct to turbine?
What is MFT and when it is acted.
what are all the pre commissioning activities in WTP in power plant
whatis means of PPA & FSA OR SFA in power plant operation
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)