Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


DCS marshaling Cabinet Power supply can be replace during plant running time?
Answer
Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy.
MY question is how switching done.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Power Plant Engineering Interview Questions

What happens if lizard comes in a MOCB

1 Answers   ABB, Reliance,


What is MFT and when it is acted.

2 Answers   HPCL,


What is wheel chamber in steam turbine?is it impulse blades are called wheel chamber in the steam turbine?

1 Answers  


what equipment is most efficient in power plant?

4 Answers   Adani,


What do mean by 3t

1 Answers   Aman, Birla, Grasim,


what is the basic use of power plant in equipment

0 Answers   JK Diary,


What is df/dt protection?, How to calculate setting range of 30 MW steam generator???

1 Answers   DS Sugars, MEMF,


why seal air fan is used and where it is used and where is suction taken from

7 Answers   Bhel, ETO,


What is the over speed in turbine? What is critical speed?

3 Answers  


how many safeties should be present in boiler?what are they?

4 Answers   DN, Nandi, Pump Technology, Siris, Thermax,


how shall you calculate PLF on the basis of percentage auxillary load factor

6 Answers  


under which situation or why restricted earth fault protection operates in out side its zone that is external fault

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)