Answer / n bala krishna
IF THE TANK LEVEL IS 0-100%, BUT IF YOU WANT TO MAINTAIN
30% AS THE MINIMUM LEVEL OF THE TANK. AFTER FILLING THE
TANK WITH 30% SOLUTION, I WILL PRESS ZERO TRIM. AFTER
PRESSING ZERO TRIM THE TANK WILL SHOW 30% LEVEL AS 0% IN
DCS.
| Is This Answer Correct ? | 14 Yes | 3 No |
Answer / mithilesh kr
any transmitter,control valve etc.
are follows 0-100% range.
0% called zero and 100% called span.
for setting of 0-100% of any trim
is required
| Is This Answer Correct ? | 6 Yes | 3 No |
where i can get training in INTOOLS and PDMS in Delhi-NCR OR north part of India. please reply with ur ans. at arunsamkaria@ymail.com
what do you know about Foundation Fieldbus?
If i have 4 Allen Bradely make RS logix 5000 PLC and for viewing that we are using 4 RS view SCADA for 4 different packages. Now, I will want to view two packages on only one SCADA. Then how i will do it?
what is three element in thermal boiler
what is difference between modbus & fieldbus
How will you calibrate PID controller? explain with example.
0 Answers Jacobs, Sirte Oil Company,
what is vibration a part of proceess variable? if vibration is a part variables then how we minimize the actual vibration on machine on load,? vision of instrumentation contrl plz ans me IPGDL interview question
what is three element loop
What is PDS and PDMS ?
Which boiler is use in power plant
what is plc communication?
what is the process to make control schematic ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)