can any body tell me what is standard cost estimate with
out quantity structure,and what is the configuration
settings for that?
Answer / john
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
Is This Answer Correct ? | 0 Yes | 1 No |
WHICH TYPE OF PROBLEMS WE CAN FACE IN CO SUPPORT PROJECT? IT IS LITTLE BIT URGENT PLEASE REPLAY ANY ONE ASAP?
In PC for the std cost of proc raw material say A,B,c,D with prices 11,14,10,16 and if I want to pick price 14 as std cost of a product how would you do the configuration in CO-PC
Hi gurus, recently i faced an interview with IBM they have asked me, what are the critical issues that u have faced so far, and how did u resolve those issues, tell me three issues and tell process.
What is the Difference between Classic GL, New GL from Controlling point of view.
What is line item display? : fi- general ledger accounting
hi this is ganesh what is expected package for 3 years experiance person in SAP(FICO)
what is the difference between "cost analysis" & "itemization" in any production order.
1Period 001/2012 is not open for account type S and G/L 799999 :- Please help me out in resolving the below error while stock-posting in MB1C "Period 001/2012 is not open for account type S and G/L 799999"
Explain managerial closing. : fi- general ledger accounting
explain the new gl concepts
What is a request for quotation (rfq)? : fi- accounts payable
Hi, If we have 10 company cocodes, in which we created 9 operative chart of accounts for 9 company codes and for last company code we created contry chart of accounts and we assign all company codes to one group company... can we get the reports for 10 company codes ?