can any body tell me what is standard cost estimate with
out quantity structure,and what is the configuration
settings for that?
Answer Posted / john
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is a (tax) jurisdiction code?
WHAT IS THE DIFFERENCE BETWEEN HOLD, PARKED, SAMPLE, RECURRING AND ACCRUAL/DEFFERAL? WHAT IS THE MEANING OF RECONCILIATION? WHAT PURPOSE WE DO THE RECONCILE? WHAT IS THE MEANING OF SPL GL? WHAT ARE THE CUT OVER ACTIVITIES? WHAT IS THE MEANING OF GAP ANALYSIS? PLZ EXPLAN?
Explain the planning steps in co-om-cca? : co- cost center accounting
Explain the document currency (wrbtr) and local currency fields (debt) when posting a document in sap fi?
tell about gaps in u r progject?
How to make control on vendor master data (bank account ) . We can validate the changes with transactions FK08 & FK09 in functional menu , but I need the path on Spro guide to customize the changes (bank accounts )
How do you go about configuring material ledger?
what is the form name for use functional spec? what are the steps in functional specs?
What are the benefits of a data quality solution?
Is it possible to default certain values for particular fields?
How account payable in fi is related to g/l?
What is dunning in sap? : fi- accounts receivable
Different types of erp?
Define the relationship between controlling area and company code?
How do you maintain exchange rates in sap? : cost center accounting