can any body tell me what is standard cost estimate with
out quantity structure,and what is the configuration
settings for that?
Answer Posted / john
A cost estimate without qty structure is the KKPAN, its a
manual cost estimate and does not use the work center
routing scenarios that exist with a qty structure.
the config settings, are cost component structure the
costing variant, and possibly the costing sheet if that was
required.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is the integration point in fi-mm in obyc. Which gl a/c has to be created ?
Is it possible to change an existing b/s gl a/c to the p&l type? : fi- general ledger
what is difference between consumer based accounting and purchasing based accounting and how to assign the difference to profitability analysis.
How many chart accounts can be assinged to a company?
What is "dunning" in sap?
Define depreciation areas? : fi- asset accounting
Why should we use external number range inspite of using internal no. range in Asset Configuration? Plz. give the answer in detials.
Suppose we have created a PO with qty 100 Ton and we have done MIGO with qty 99 Ton and after that we have MIRO 100 Ton. Interviewer asked me how can we load the difference qty balance of migo and miro (100-99=1ton) on material? please help regards sandeep.
Explain cash management in sap? : fi- general ledger
What are group assets?
Explain the usage of the financial statement version tool in sap software.
What is asset super number in sap? : fi- asset accounting
Hi, Need a interview question and answer for different company's please revert me soon Yash
1. how can see that how much the vendor is owed 2.how do u reverse a MIRO invoice 3. how do u pay vendor in foreign currency
What is a posting key? : fi- general ledger accounting