a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answers were Sorted based on User's Feedback
What is the best design for building bridges?
What is progress payment?
IF X = Cement ,Fine Aggregate & Coarse Aggregate are in taken in weights for batching. Y= Cement , Fine Aggregate & Coarse Aggregate are taken in volume for batching. Then what will be the relation between X and Y?
hai.... please any guide me were i can get interview questions& ans for Unigraphics
how can i calculate cement in brickwork
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is steel reinforcement required for 1000 sqft house as per besic RCC frame structre ?
Define absolute co-ordinates?
if a 1 storey building is constructed without columns&beams and having the thickness of walls 12" in which cement&sand mortar is used what is the lifespan of building
0 Answers Ryna Facilities Services,
I want to know about history of civil engineering?
What is Bearing Capacity of Soil? How will you calculate for a particular type of Soil?
5 Answers Nagarjuna Construction,
diffrence between mjb & mnb
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)