Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40

Answers were Sorted based on User's Feedback



a revised estimate is prepared when the original estimate has exceed by more than 1 percent ..

Answer / jatin

10%

Is This Answer Correct ?    11 Yes 1 No

a revised estimate is prepared when the original estimate has exceed by more than 1 percent ..

Answer / pardeep kumar

More than 2%

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

Explain what is the release of lien?

0 Answers  


hi i am kailash we construction start a slab load baring 40feet *9 feet *4 inch plz suggest matarials and qty

1 Answers  


RR masonry rate analysis

0 Answers  


WHAT IS THE IMPORTANCE OF FLY ASH BRICK?

2 Answers  


what is the weight of 12mm aggregates?

0 Answers   Apache,


The point of contraflexure occurs in

10 Answers  


how many running meters in one kilogram of 4mm pvc coated chainlink fencing

0 Answers  


weight rcc m30

4 Answers   Jindal,


What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?

1 Answers  


How to find out slope footing concrete

0 Answers   Ekta World, Punj Lloyd Ltd,


Though Column is a compression member and concrete takes compression, why we use steel at column ?

4 Answers  


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)