Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40

Answers were Sorted based on User's Feedback



a revised estimate is prepared when the original estimate has exceed by more than 1 percent ..

Answer / jatin

10%

Is This Answer Correct ?    11 Yes 1 No

a revised estimate is prepared when the original estimate has exceed by more than 1 percent ..

Answer / pardeep kumar

More than 2%

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between yeild strength and compressive strength of steel???

0 Answers   Simplex,


pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?

1 Answers  


How many Sft of Level Plaster per Kg

0 Answers  


what are the differences between Tie beam, Ground beam and strap beam. thanks

1 Answers  


What are the steps involved in the concreting process?

0 Answers  


Soil is clay

2 Answers   L&T, NBCC,


we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently

3 Answers  


Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

1 Answers  


Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and outurn of mason. Thanks.

3 Answers  


Define block?

0 Answers  


1 cubicmeter liquid = how much litre

6 Answers  


HOw much % of premium on DSR-2013 currently

0 Answers   NICE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)