why we create short columns under grade slab?
No Answer is Posted For this Question
Be the First to Post Answer
beam top main reinforcement(25mm) was drilled off by mistakely when making drill hole for dummy columns. any one can give useful information for this issue or related code or websites.
What isthe formula for square
1 Answers Panchayati Raj Department,
what affect on the structure and related beam of slab when provide one way slab insteade of two way slab
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
what is the meaning or full form of 12T13 cables used in prestressed bridges
what is mean by "SQP"
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the difference between nominal mix and design mix?
How to decide/consider the grade of bitumen for dbm.
What is rate of concrete surface rendering work per sqm
material used for mendrel use to bend epoxy coated rebar
0 Answers Saudi Aramco Shell Refinery Company SASREF,
What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)