How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / zuber ahmed
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 + 1 = 1.35 cu.m.
Cement required = 1/6 X 1.35 = 0.225 cu.m. =6.8Bags
Sand required = 5/6 X 1.35 = 1.125 cu.m.
Bricks required = 500 Nos.
| Is This Answer Correct ? | 10 Yes | 43 No |
Post New Answer View All Answers
What is passive earth pressure ?
afe or not
Howmuch bend to be provide for 200/600 BEEM
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
What are wooden shingles?
What is meaning of tlc
The portion of a brick cut across the width is called?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
pls give me ans to ACT formula cube testing porpuse
what is the basic difference between Coloumn & Shear Wall