Integration of PP with MM , Integration of PP with SD .
Answers were Sorted based on User's Feedback
Answer / chaithanya
Integration of PP with MM is at the MRP stage, ie when the
material in stock is not at the required quantity, the
material request is sent to MM people.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
Is This Answer Correct ? | 0 Yes | 0 No |
Can any body explain me why work scheduling view is required for semi finished and finished products?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What is alternative bom
What is planning time fence and where will be reflect
What is alternative BOM, or diff between BOM group and Group BOM?
What parameters you maintain in “plant parameters” in configuration?
what is Standard order type
In realization stage what you will do
How the processing time is calculated in a wc when both labor, machine categories exist?
Define mrp list
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
how to create report in sap pp