Integration of PP with MM , Integration of PP with SD .

Answer Posted / c.kartikeshwar

SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is time phased Planning?

1311


What is group bom?

741


What are the customer activities followed for pp module ?

608


Mention what is the difference between stock transport order and stock transfer order?

633


What are gaps? Some examples?

591






Integration between PP and MM Module.

1460


What is processing class, where we do them and why?

598


Explain Kanban.

1116


What are basic dates?

645


Explain what is the use of sap material view and list out other parameters where sap material view is applicable?

606


Both labor and machine categories exist. How would you calculate the process time?

608


What is meaning of customized reports?

651


What is MTS and MTO and the difference between them?

1939


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

605


Why the work scheduling view is required for semi-finished and finished products?

583