Integration of PP with MM , Integration of PP with SD .
Answer Posted / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Checkdigit example
Integration between PP and QM Module.
What is testing & explain standard testing
Explain the lsmw and the steps involved in them.
Difference between byproduct and co-product.
What is costing? How it is affected the pp?
What is recursive BOM
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What is the internal recruitment?
Explain why their is need of production version ?
How do you get the system to update this value from the routing?
How can I use variable size items?
Explain PI sheet.
Are there any reports in sap to list of material requirement from ltp ?
List out the activities carried out in production planning?