Integration of PP with MM , Integration of PP with SD .
Answer Posted / chaithanya
Integration of PP with MM is at the MRP stage, ie when the
material in stock is not at the required quantity, the
material request is sent to MM people.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What is routing in sap pp?
How do you restrict the data to be entered in the payroll area?
What is planning file entry
Difference between PP and PI.
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
what is alternative item group
What is planned consumption and unplanned consumption?
What are the levels of batch, explain batch determination process?
How can you create production order without routing and BoM?
What parameters you maintain in “plant parameters” in configuration?
What are gaps? Some examples?
In lsmw which is most important step?
How system calculate the actual cost?
What is scheduling
Define ‘bom group’?