Integration of PP with MM , Integration of PP with SD .

Answer Posted / chaithanya

Integration of PP with MM is at the MRP stage, ie when the
material in stock is not at the required quantity, the
material request is sent to MM people.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is routing in sap pp?

781


How do you restrict the data to be entered in the payroll area?

606


What is planning file entry

1874


Difference between PP and PI.

1611


Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4311






what is alternative item group

1976


What is planned consumption and unplanned consumption?

2356


What are the levels of batch, explain batch determination process?

1106


How can you create production order without routing and BoM?

1035


What parameters you maintain in “plant parameters” in configuration?

1761


What are gaps? Some examples?

591


In lsmw which is most important step?

632


How system calculate the actual cost?

1290


What is scheduling

1648


Define ‘bom group’?

622