what is cut over strategy?
Answers were Sorted based on User's Feedback
Answer / ratnakar reddy k
Cutover strategy or Cutover plan is the activity done in
ASAP methodology, while transfering the data from the
lagacy system to the sap system.At this point of time the
billing will be stopped,all the open
orders,contracts,pricing data will be transfered as per the
cutover plan which is provided by the implementation
partner.what ever you want to do on the system u need to do
before or after this activity.
Is This Answer Correct ? | 54 Yes | 6 No |
Answer / manoj kumar guin
hi
Generally in implementation under final preparation phase
we do the cut over strategy whichich is nothing but the
data load strategy .This plan the strategy for data
conversion.And which data will load first for example
masterdata or transaction data all planning and strategy
known as cut-over strategy .
Regards
manoj
9019220754
Is This Answer Correct ? | 6 Yes | 5 No |
cut over strategy depends upon how the org. design their load strategies.normally we decide the sequence of data load for configuration settings, master data, transaction data,which follow whom and then u make a copy of the system a day before and after checking the successful data load.
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / tapas dey
During the cutover plan activity, transfering the Data from the legacy system to SAP system(Production server). and that time all the bussiness transaction will be stop.
After that upload or Transffer all the Master data and Transaction data into the Production server through LSMW or BDC.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / kj..
ts end of final preparation,that means to stop rhe dev&qut
systems and it is to the sap system.At this point of time the
billing will be stopped,all the open
orders,contracts,pricing data will be transfered as per the
cutover plan which is provided by o.......
Is This Answer Correct ? | 4 Yes | 4 No |
Answer / rockey
cutover strategy: -its mean stop the old system and transfer old data in sap system. In this remove the dublicary and they clear the errors.
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / narasimha
its end of final preparation,that means to stop rhe dev&qut
systems and it is ready to run in producyion system,cut over
to production.
Is This Answer Correct ? | 5 Yes | 15 No |
In sales order what fields are mandatory????
Explain about your role in current/previous project? (If you have one)
what are the besic settings for output determination and what are the setting for getting E-mail output after saving the sales order?
which screen support consultant uses in support project?
What is the difference between task and change request?
What is meant by condition technique? Can we say it is the combination of condition types, access sequence and condition tables?
how can you do consignment in inter company sales?
Dear Gurus, Can u please tell me the team size of Implementation project, how many different modules Consultant Involves to finish successful project
Explain sales document blocking?
Hi this is bhargava here,I have 3months experience in marketing,& i have done SAP-SD.I need 1 offer in IT sector,any one help me plz.If u want 2 suggest me then mail me 958639@gmail.com
What is solution manager?
What are applets? How is it different from a reusable transformation?