Answer Posted / manoj kumar guin
hi
Generally in implementation under final preparation phase
we do the cut over strategy whichich is nothing but the
data load strategy .This plan the strategy for data
conversion.And which data will load first for example
masterdata or transaction data all planning and strategy
known as cut-over strategy .
Regards
manoj
9019220754
Is This Answer Correct ? | 6 Yes | 5 No |
Post New Answer View All Answers
why tolerance groups are to be define in sap?
Difference between business sale cycle nd customer sale cycles?
What are the three levels that copy controls are set up? And what are the transaction codes through which it could be done?
At which levels in the sales document can you have different incompletion procedures?
Explain the interfaces you have worked on?
In one sales order there are two materials can maintain two different pricing procedures for these materials?
What Time Neede to Upload Master Data and Trasaction Dat From Non SAP Systum to SAP Sys. through LSMW Tool ?
It will be really helpful if someone can provide an example / System behavior where (1) only AC is used, (2) only TOR is used, (3) both AC & TOR is used ( in schedule line category) thank you
how offen sand box server refresh?
Is it possible to create sales order for 40 items if the quotation is sent for 30 items?
To what do you assign distribution channels and divisions?
What is the purpose of text determination, account determination, partner determination, output determination, storage location determination.
Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?
What are the important organizational elements of sap sd?
What are the condition record and condition table?