Answer / rameez_rz2000
1st of all we have to open the control valve 50% and then
the feed back link of positioner will came at 180 degree to
control vale and now we will adjust the screw
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / rk
think positioner is nothing but a control valve.installation of positioner is done by closing the valve,then it has flange which helps to b screwed with pipes.
| Is This Answer Correct ? | 0 Yes | 3 No |
which are types of orifice tap ?
what do you mean by smart instruments ? define ? give an example?
2 Answers Flour Tech Engineers (P) Ltd,
I am an intru engg frm pune n completing mba marketing in may 2010, what kind of profile would best suit my educational qualifications??? Also, i will move to US in jan 2011, so this job experience should count Over there too 'coz i want to continue workin even there....
How is PH sensor works ?
how u meassure a room temp?in rtd or themo couple?
what is the well head protection system?
what is the input of digital RPM indicator during the calibration time?
different between calibration range and instrument range ?
What is the difference between HMI,SCADA and MMI,not abbrevation?
what the differant between Wet Leg /Dry Leg
Working principle of vibration sensor?, Type of vibration sensor? , Can we use vertical instead of horizental or vice versa?, if not Reasons?
Specify ideal accuracy of flow element like orifice plate, Ventury, Annubar. Ultrasonic flow meter etc.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)