how much quantity a carpenter do shuttering per day
Answer Posted / aijaz hussain, modi builders
The Out-turn of a Shuttering carpenter per day is between
2.5 sq.m. to 3 sq.m.
Is This Answer Correct ? | 63 Yes | 27 No |
Post New Answer View All Answers
What are the responsibilities of a construction manager?
Is it possible to make a feature using an overdefined sketch?
How do you measure water flowing through 300mm diameter pipes?
The 4 main factors to start a construction project are––
How to find out slope footing concrete
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
sir please send me campus placement questions in civil engineering
What is the tensile strength of marble?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to find quantity of concrete in PCC M15
Forces in a Shear Wall are in plane or out of plane ?
What is a projection line?
What are the important hardware systems used for cad?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
Why are separation membranes used between concrete pavement slab and sub-base?