how much quantity a carpenter do shuttering per day
Answer Posted / asif
8 to 12 Sq.M per day,( 1 Carp + 1 Help )
Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
how many litres of enamel paint required for 5000 sft of site??
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
Explain what is the difference between built area and super built up area?
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
What are the basic use of runners and standards of pipelines?
115mm thickness brick work how to required mortar
How to calculate Volume of Wet cement concrete for a specific grade?
What do you understand by “preset” during the installation process of bridge bearings?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What is meant by Crystal Concrete?
How to do rate analysis for concrete work including shuttering work?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
What is the absolute pressure scale?
States some of the commonly used commands in cad software’s?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?