how much quantity a carpenter do shuttering per day
Answer Posted / nitin adate
Actually Shuttering output is depend upon type of
structure,height of structure, slab to slab height,shape of
structure, type of shuttering & most important availability
of skilled labour.But for planning purpose 2.5 to 3.00
sqmt /per day ( 1Skilled Carpenter + 2 helper ) is
reasonable value.
| Is This Answer Correct ? | 106 Yes | 31 No |
Post New Answer View All Answers
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
what is the theoritical percentage of concrete cubes testing per day?
What is the Null Point of chimney in Power Plant
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
How do you calculate load bearing capacity of a waffle slab?
Which purpose we use deck anchor in bridges?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
How many are the types of joints?
What is a bearing capacity of soil?
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
What is the name of this multiplication factors ?
What will be weight of 0.5mm GI sheet per sq.ft?
What are the composition of a landfill?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
What is meant by scaffolding coefficient?