how much quantity a carpenter do shuttering per day

Answer Posted / vickey

10 sq.m. per day inclusive slab & beam

Is This Answer Correct ?    44 Yes 44 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

cement and sand required for one block of size 0.23*0.15*0.46

1495


acceptance criteria for concrete works

1783


What are the advantages of cad software?

769


what is the use of water bar in water tank and is this an extra item in estimate?

2209


how much shouid be the rate for ready mix concrete per cubic meter

1556






what are the code used for residental building?

2154


Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?

2692


What is meant by cartesian coordinate system?

784


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1617


Time required for curing of wall tiles before fixing

1866


Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)

1568


what is total volume of ingredients used in concrete accordingly

1890


how to calculate testing date

1332


what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?

1733


1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...

1730