how to creat mix m-20? and how to check shuttering & how is
mark layout at open ground
Answer / ratheesh
M20 = 1:1.5:3
shuttering
1. Slab & beam bottom level should be checked.
2. All props and bracing pipes should be checked,
3. Beam & Slab side alignment should be checked
4. side shuttering plump should be checked,
5. All room dimensions & Openings dimensions should be checked
6. before reinforcement should be apply shuttering oil.
Layout
you should be use pythagoras theorem...
| Is This Answer Correct ? | 2 Yes | 0 No |
if dia of capillary tube is doubled the capillary rise will unaffected doubled halved none
What is the standard unit of bricks???
What does civil engineering mean?
Explain what is progress payment?
Is there any difference in IS 456 and IRC 15?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
we are use us steel in PQC road
how tl calculate lap lengh of concrete in different grade of concrete.
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Did you handle any interior designing jobs?
how to calculate the bricks in 100yard
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)