how to creat mix m-20? and how to check shuttering & how is
mark layout at open ground
Answer / ratheesh
M20 = 1:1.5:3
shuttering
1. Slab & beam bottom level should be checked.
2. All props and bracing pipes should be checked,
3. Beam & Slab side alignment should be checked
4. side shuttering plump should be checked,
5. All room dimensions & Openings dimensions should be checked
6. before reinforcement should be apply shuttering oil.
Layout
you should be use pythagoras theorem...
| Is This Answer Correct ? | 2 Yes | 0 No |
How many bricks are required for 100 sq ft 5" & 3" wall, Brick size= 230x115x75
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
What are the types of slump?
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
If in a structure, e.g, 20mm steel bar is not available and we use 16mm steel bar instead of 20mm bar, how can we calculate the no. of steel bars for 16mm diameter bar?
crank types
how to do connection between steel beam (I-Section) with R.C.C column??
What is the thumb rule for calculating the number of chairs in slab?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
volume of 2 bulbs in pile of height 10' diameter 1'3''
Engineering method, why need is column kiker??? what is necessity??
Why do not use fly ash bricks for waterproofing.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)