1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Answers were Sorted based on User's Feedback
Answer / rohit
Mr. Srinivas,
Can u tell the calculation formula.
Regards,
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / srinivas.maradana
1)The 200 pile reinforcement cuuting lengtg 050mtr with
lap060 mtr
2)the qty is 00942 for 3 mtrs
| Is This Answer Correct ? | 1 Yes | 4 No |
what should be the minimum cross sectional dimensions of column for any given loads????
what is poissons ration of steel?
What is Time at Large?
how can we calculate cutting length of a column ring (300 x 600)
16 Answers AVL, Manchanda, Vardhman,
what are the values of compressieve strenght?
1sqm=? wood
2 Answers Ackruti, Nagarjuna Construction, SRS Group,
sir how can we find the cement and sand required for making 4" drop
how to take quantity in triangle section for calculating tender purpose
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
acceptance criteria for concrete works
what is the minimum & maximum compressive strength n/mm2 of M-30 mix design cube
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)