How much Tolerance factors like 1. brick work
2.plaster
3.painting
4.floor tiling
5.wall tiling
6.shuttering
7.concreting
8.steel
No Answer is Posted For this Question
Be the First to Post Answer
how to prepare Steel schedule or Bar bending schedule.
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
qube strenth in 7nth days test
What is yield strength of steel?
what is the density of concrete & steel? where we are using pycnometer? what is bulking of sand? what is under reinforced & over reinforced? what is balanced section?
what is the load capacity of bored pile pile dia 500mm
What is chemical composion test
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
how much quantity of paint is required for 1 square meter wall for single and double coat..?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
Can we weld hot rolled steel ASTM A615 ?