How many binding wire is use in arrangement of 25mt steel
Answers were Sorted based on User's Feedback
Answer / shweta garg
in steel reinforcement binding wire required is 8kg per MT, so for 25MT the binding wire required is 25*8= 200kg
| Is This Answer Correct ? | 11 Yes | 1 No |
Can fly ash bricks can be used in brick bat coba?
What are the tests conducted on coarse aggregates ?
What is BOQ why to calculate BOQ
Explain what is Hybrid Foundation?
std ht of wallmixer from ffl
what"s the formula to find the quantity (consumption) of cement,sand,aggregate for 1m3(1:2:4)?
11 Answers ABB, Construction, Isher, L&T, Saudi Oger, Spectra, Strati,
my client's 10 year old building have been affected by the neighbor new building construction with out set back.Old building cantilever bldg hanged by 3". It is supported by introducing 2 rcc columns & beams.Now how to conceal the cracks?
what is the difference between compaction and consolidation?
I've 47'-6" x 89'-6" of flat RCC Slab 12mm dia 8" c/c. Please calculate the total weight of slab, weight of steel, and how much dead load it contains. Thanks
What is the best design for building bridges?
how many kg reinforcement is required for G+ 1 roof slab of 1200qf slop slab with 5 inch thickness of house.
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)