why we need pcc?
Answers were Sorted based on User's Feedback
Answer / patel
1.level the surface
2. prevent dampness
3.avoid corrosion
| Is This Answer Correct ? | 22 Yes | 1 No |
Answer / r n sharma
To bind the reinforcement firmly.
To bear compressive stress.
| Is This Answer Correct ? | 1 Yes | 12 No |
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
What is logic behind the use of Steel bar insted of gold bar?
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
how to calculate the number of cement bags for basic construction..?
3 Answers Gammon, Indu Projects,
what is stress?
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
What is the PH value for domestic water supply
Did any of the egyptian pyramids ever fall down?
FOR concrete structure curing is important for hydration process,curing component is good for the concrete if W/C ratio is more than .38
pls tell me , what is the water content
What is bending movement formula define
How do you measure the centring work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)