in elevator industries , how to calculate the required KVA for the elevator (elevator spec- 40A module , motor of 13.5KW, 20A)
1 13605I am abt to give IOCL intrv.Plz sir guide me for IOCL intrvw (Electrical).Which subject to be consider. questions are generally asked from which subject.Plz help me out.
IOCL,
1951What is the safety factor is to be consider while selecting the switchgear and protection for electrical system
1 4501Input power is 380 - 450 V but with 45 - 55 Hz frequency - desired output is 415 V and 50hz with 1% variation permissible. CVT / Servo dont stabilize the Frequency - what is best solution??
IOCL,
7 10822Post New Electrical Engineering Questions
wish of these transformer uses oil?
Why do we perform an open-circuit test and short-circuit test on the transformer?
What is class ab operation?
What is the minimum IR value of HT/ LT cable? Pls post separetely!!!!!
Hi friends, i m electrical engineer i want a cdr for migration purpose so anybody have information about this then send me on jayesh_ee88@yahoo.com.please try to me
EXPLAIN METOD OF IMAGE OF TRANSMISSION LINE/ WHAT ARE ITS PRACTICAL APPLICATION?
Why in 6 KV XLPE cable termination kit used and why not in 380 V xlpe cable same is not used
What is different bewteen low or high impedance busbar protection scheme
dear sir/madam i want to get some knowledge about RRB EXAMINATION(section engineer) 1- what is minimum cut off 2- wht portion is major portion . 3- can any body provide Sample paper. thanks & regards ashish
oil cooled transformer
What is instrumental error?
Is there a possibility to use such a treshold voltage for the NMOS part of a CMOS circuit that during the switching it will start conducting only after the PMOS part will be already closed, by this eliminating the leakedge current? Please note, I'm not asking about the well bias in standby mode, but about the "antileakedge" measures during normal operation.
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?
what is effect of 5amp fuse on 2mva pry protection of transformer