WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING
TCS,
1856Post New Electrical Engineering Questions
How to calculate Temp from Resister from PT100 equation,
why tertiary winding is used in transformer with diagram?
If there are two transformer having rating of 2.5mva, 6.6kv/440v(satr-star),and the load is 600kw then what is better to maintain less losses in transformer having both transformer in parellel or only single transformer connected to load? Please give calculated answer
what will be project cost for 100 kv transformer connection under oyt scheme.
While testing a ZCT what parameters have to check or measure?
What are the specifications for getting approval of Substation?
distribution is maximum done by a)radial b)network c) parallel d)b & c
how we decide wire gauge for ac or dc coil and what is the basic diff. B/w these two coil?
What aturn on methods of scr?
What are the advantages of hydropower?
How servo stabilizer works.
what is the function of statics switch in ups and tell me parts
do any one help me to get "C" license,, i have doubts ,,, if mediators ter pls call me,, my no is 8056640042
please tell me how a surge protector work on a DC 48Volt.? please describe briefly.
An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.