Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?



A floor has to be removed partially with block work tying floors together, can block work continue ..

Answer / sujit

what is block working. if it is brick working or what.
if you want demolishing then you give support for others.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L

0 Answers  


what is mean by "SQP"

1 Answers  


How to calculate Volume of Wet cement concrete for a specific grade?

0 Answers   MBPL,


Explain moment of inertia?

0 Answers  


Typical floor design load in Residential Building----------- -----

2 Answers  


define the engineering property of a soil. make a list of list property(properties)

2 Answers   AAI Airports Authority Of India,


wat is diff. between rectangle & parallelogram?

4 Answers  


List out the densities of different construction materials such as brick, steel, sand, aggregate etc...

19 Answers   Happy Homes, Sand,


how much extra rod length should be provided for beam

1 Answers  


how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring

1 Answers   Jade Software, NSP, TCS,


In your experience what is the maximum beam length. What's beam size and also please provide column size also. Thanks.

1 Answers  


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

0 Answers   UPSC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)