A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?
Answer Posted / sujit
what is block working. if it is brick working or what.
if you want demolishing then you give support for others.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Ratio for 4500 psi concrete
what is the tensile strength of 10swg and 8swg gabion wire?
In earth work 1300 cum soil how to calculate how many liters require in water
How many % we consider for lap for reinforcement for estimates
Minimum concrete cover in slabs, columns, beams, foundation and other st?
what is the type of earthing
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
why is the column design?
What is the meaning of soil reinforcement?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
explain the advantages of total stasion
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is the ideal size of the living room ranges from small to large size?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How to calculate canal slope curvature qty!