A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?
Answer Posted / sujit
what is block working. if it is brick working or what.
if you want demolishing then you give support for others.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Will water damage concrete?
A roof has a U value = 0.65 W/m2 .C. Extra insulation is to be provided. This insulation has a thermal resistance = 1.5 m2"C/W. Calculate the new improved U value.
What is the crank length in the slab?
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
How do you determine specific gravity of cement?
What in bending moment, if a moment is free end of cantilever beam?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
howto calculate the quantities of material used in fly ash brick after finding the volume??
which red: used in roof teping, then use only cement
How to find beam R/F cutting length
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
What is the usage of zoom command?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure