what is the ratio of cement water and sand in RCC?
Answers were Sorted based on User's Feedback
Answer / shaikh moyunuddin
for rcc minimum M20 grade is used
it's depend how's the building is design
& m20 propotion is 1:1.5:3(cement:sand:aggregate)
& for water 40 to 55%
total area of rcc
| Is This Answer Correct ? | 26 Yes | 4 No |
Answer / sandip
the water cement ratio of m-20( 1 : 1 1/2 : 3 ) is taken normally 0.45 . Example for 1 cmt m-20 grade of concrete cement consumption is around 350 kg, thus the water consumption will be as below
consumption of water = cement x 0.45
= 380 x 0.45
= 171.00 kg ( =188 lit )
| Is This Answer Correct ? | 10 Yes | 4 No |
Answer / csr
It depends on which grade we are using and it depends on
the required strength.
minimum we start from M15 1:2:4,
M20 1:1.5:3,
M25 1:1:2
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / shri
m20 1:1.5:3 Cement:Fine aggregate:coarse aggregate water in ratio 0.5
| Is This Answer Correct ? | 3 Yes | 7 No |
Answer / hiren
in rcc generally M-20 is used hence for M-20 proportion are
1:1.5:3.... c:ca:water
| Is This Answer Correct ? | 9 Yes | 16 No |
Answer / fathi abu sabha
for m20 1:3:6 , cement ,sand , aggregate
for m30 1:2:4 , cement ,sand , aggregate
| Is This Answer Correct ? | 8 Yes | 17 No |
What is fineness modulus ? and its sieve # ?
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
What are the Tests required to check the Quality of bar?
what is mean by compressive strength
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What is allowable limit of silt in river sand for concrete
How to calculate material and labor required for 100 m2 plaster?
how calculate bench mark errors
for 100 sqm cement concret (1:2:4) 4cm thick floor,the quantity of cement required is
minimum thickness of pcc 1;4;8 for road concrete
Advantage of Aluminum form work in terms of activities can be skip and cost too
For the construction project what capital cost has to be taken in consideration?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)