Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


we are roofing contractors,we are filling a bill in work
contract 4.12% method, we collecting 4.12% from our customer
but every month we have been paying the vat at 2% from our
pocket on the total value of bill. our auditor told me the
above method do not collect 2% from the customer side is it
true?



we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12..

Answer / visal

No

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

the construction of building in that primary thing is dig the soil which what depth will dig in stiff soil

1 Answers   L&T,


what is mean by bleeding of concrete

4 Answers   Afcons, Habib Group,


what is curtailment in rebars

1 Answers   KES, NCC,


IS code for Rolling Margin of steel

0 Answers  


What is the bending moment ?

1 Answers   L&T, Manav Infra Projects,


how can we design dia of rainwater pipes ? plez explain by using formula ?

1 Answers  


what is the detention period for oxidation ponds

2 Answers  


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

0 Answers  


What is hybrid foundation?

0 Answers  


what is density on steel bars?

3 Answers   AICL,


what is work of planning deptt. in any construction compny (in road project)

0 Answers   bscpl,


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

19 Answers   DNA Infrastructure, HCC, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)