I've one slab of 24m x 43m. How to calculate required steel
For this slab.
Answers were Sorted based on User's Feedback
LBD= 24 X 43 X 0.125 (SAY, REQUIRED TO ACHIEVE AS PER
DESIGN)= 129 CUM
VOLUME OF STEEL 1% (SAY, REQUIRED TO ACHIEVE AS PER DESIGN
& BBS)= 1.29 CUM= 1.29X 7850 kG= 10126 kG, Apx= 10 Ton.
| Is This Answer Correct ? | 14 Yes | 6 No |
generally it is depending upon the design of slab, becasue
you have such big sapn so there is beam between them. its
depends upon how to design the slab by structral engineer.
generally its depends upon client rquirement.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
Length of Slab = 43M
Width of Slab = 24M
Heigth of Slab = -----(Not Given)
You can not find the quantity of reinforcement .
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / saravanan
hi.
1) length of slab/spacing=no of bar lager side
2) width of slab/spacing=no of bars in shorter side
3) length of one bar = length of slab-(2*cover thickens)
4) length of one bar longer side*total no of bars in longer side(+)length of one bar shorter side*total no of bars=total length of bars requirement in slab
..weight of one meter bar =d^2/162
total weight of bars=total length of bar*weight of bar
| Is This Answer Correct ? | 0 Yes | 0 No |
what is injection grouting and what is rewiring.
what is c4x light weight cement blocks
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
If specific gravity of cement is less than 3.15 what is the cause?
What is meant by M20 grade of concrete???
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
How to take labor charges for construction of 1cum of concrete?
How to decide/consider the grade of bitumen for dbm.
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
What is "L" provided at the base of column??
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)