in how much square meter of slab we are providing a beam it
may be oneway or twoway slab.
Answer / maheswaran
LY/LX<2 THAT SLAB CALLED TWO WAY SLAB
LY/LX>2 THAT SLAB CALLED ONE WAY SLAB
FROM IS 456-2000 1M LENGTH YOU SHOULD PROVIDE 7 CM DEPTH OF
BEAM
| Is This Answer Correct ? | 11 Yes | 0 No |
Define line type?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Dear Friends am S.PRABHU looking for job chnage i have wonderfull exposure to both Construction works & i have a experience 11 years if any found any suitable opening, please Contact 9986539249
Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an example.
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
whats the field test of cement,aggregate and water
Cost control in civil construction as well as Quality control
What are the applications of modulus of elasticity?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
How to calculate woden area in sft and Cft
Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)