in how much square meter of slab we are providing a beam it
may be oneway or twoway slab.
Answer Posted / maheswaran
LY/LX<2 THAT SLAB CALLED TWO WAY SLAB
LY/LX>2 THAT SLAB CALLED ONE WAY SLAB
FROM IS 456-2000 1M LENGTH YOU SHOULD PROVIDE 7 CM DEPTH OF
BEAM
| Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
what is the formula to find the diagonal shape stirrups?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
what is anchorage length,lap length and (dont remember the last one)
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
What is the difference between linear dimension and aligned dimension?
What is the outturn of Ceiling plastering
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
can stub column take the load as main column
what's the formula for calculate pcc for matt(45mm aggregate)?
How much quantity water should be placed in one cubic meter area?
What is factor not to be taken in consideration in mix design?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?