Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.

Answers were Sorted based on User's Feedback



Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / raju

Right formula is = V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE
UNDER A1 A2 ] where , l = length , b = breadth , d = bottom
depth , h = D - d , A1 = bottom area , A2= top area (ii) is
= V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d ,
A1 = bottom area , A2= top area, Am = Mean of Top and Bottom
Area


feel free to call me
Raju
Engineer-Civil
9999213613
DLF

Is This Answer Correct ?    60 Yes 3 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / s.prabhu

above said is correct answer

Is This Answer Correct ?    14 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / raja j

in trapezoidal footing we seperate the footing as two
parts.one is rectangle another is trapezoidal

for taking rectangular portion= (L*B*d)
L=length of footing
B=breath of footing
d=footing depth (at the end of rectangle portion height)

for taking trapezoidal
v=h/3((A1+A2)+sqrt(A1A2))
V=volume
A1= footing area (L*B)
A2= column area+ add 50mm for each side ((l+100)+(b+100))
h=height difference(D-d)
finally,
Add =rectangle+trapezoidal
= (L*B*d)+h/3((A1+A2)+sqrt(A1A2))

Raja.j
9626389621

Is This Answer Correct ?    9 Yes 5 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / jigar soni

V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area

Is This Answer Correct ?    5 Yes 1 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / s.prabhu

Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)

Volume of top / slope portion is called as Volume (v2)

V1 = L1xB1xh1

V2= h2/3* (a1+a2)* square root of (a1+a2)

L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2

For any clarification
Please call
S.Prabhu
9901702081

Is This Answer Correct ?    7 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / krishna kumar.a

Quantity = 1/6*(top area+bottom area+ 4* mean area)
Example
top length =3m, width =2m
bottom length =5m , width =4m
height =1m
Top area =3*2 = 6 sqm
Bottom area = 5*4 = 20 sqm
Mean area =(5+3)/2*(4+2)/2 = 12 sqm
Quantity = 1/6*(6 + 20 +4*12)= 12.33 cum

Is This Answer Correct ?    9 Yes 7 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / sekar.k

QUANTITY CALCULATION FOR TRAPEZOIDAL: 1/2*H(A+B)*L

EXAMPLE:FOOTING TOP WIDTH:2.00M
FOOTING BOTTOM WIDTH:4.00M
FOOTING HEIGHT :6.00M
FOOTING LENGTH :10.00M THEN,
QUANTITY OF TRPEZOIDAL FOOTING :

1/2*H(A+B)*L

1/2*6.00(2.00+4.00)*10.00

1/2*6.00(6.00)*10.00=180.00CUM

Is This Answer Correct ?    5 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / madhu sudhan p

h/3xa1+A2+(SQRTa1xA2)

Is This Answer Correct ?    6 Yes 5 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / nadim

divide into 3 parts 1st into 2 traingles and 1 into a rectangle we all know the area formula then multiply the area with the remaining dimension

Is This Answer Correct ?    1 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

What is the design mix? What is the proportion for M25, M35, M40 concrete mix.

9 Answers   ACC, DBM, Era Infra Engineering, Thakural Constructions,


cement mortar 1:6 explain the cement and sand coefficient calculation?

1 Answers   Mega Builders,


how to identify the failure of building by expansive soils

0 Answers  


what is difference between tor steel & TMT STEEL?

5 Answers  


1) what is the seewage discharge per person per day taken for design purpose as per IS codes? 2) how to convert gauge to MM like if we measure 18G as our door frame then how much is it in MM ? 3) how much binding wire is required ti tie 100kg steel ? 4) while making rings in steel reinforcement , whether the corners of rings are deducted to take out cutting length ? 5) how much carbon content should be there in steel used for construction purpose? 6) what are fe415 & fe 500 and which bars are used in general civil works?

1 Answers  






Advantages and Disadvantages of using fly ash bricks over clay bricks?

11 Answers   Pradhi Engineering,


1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...

2 Answers  


what is thickness of NP2 hume pipe?

3 Answers  


does the compressive strength of brick be more then 3.5 n/mm2 or 5 n/mm2?

3 Answers   L&T, Modi Builders,


What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

0 Answers  


For what building Built-on balconies are preferable? What are the advantages?

0 Answers  


18. What is the thing that might make you happy at your work place?

6 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)