Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.

Answers were Sorted based on User's Feedback



Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / raju

Right formula is = V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE
UNDER A1 A2 ] where , l = length , b = breadth , d = bottom
depth , h = D - d , A1 = bottom area , A2= top area (ii) is
= V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d ,
A1 = bottom area , A2= top area, Am = Mean of Top and Bottom
Area


feel free to call me
Raju
Engineer-Civil
9999213613
DLF

Is This Answer Correct ?    60 Yes 3 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / s.prabhu

above said is correct answer

Is This Answer Correct ?    14 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / raja j

in trapezoidal footing we seperate the footing as two
parts.one is rectangle another is trapezoidal

for taking rectangular portion= (L*B*d)
L=length of footing
B=breath of footing
d=footing depth (at the end of rectangle portion height)

for taking trapezoidal
v=h/3((A1+A2)+sqrt(A1A2))
V=volume
A1= footing area (L*B)
A2= column area+ add 50mm for each side ((l+100)+(b+100))
h=height difference(D-d)
finally,
Add =rectangle+trapezoidal
= (L*B*d)+h/3((A1+A2)+sqrt(A1A2))

Raja.j
9626389621

Is This Answer Correct ?    9 Yes 5 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / jigar soni

V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area

Is This Answer Correct ?    5 Yes 1 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / s.prabhu

Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)

Volume of top / slope portion is called as Volume (v2)

V1 = L1xB1xh1

V2= h2/3* (a1+a2)* square root of (a1+a2)

L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2

For any clarification
Please call
S.Prabhu
9901702081

Is This Answer Correct ?    7 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / krishna kumar.a

Quantity = 1/6*(top area+bottom area+ 4* mean area)
Example
top length =3m, width =2m
bottom length =5m , width =4m
height =1m
Top area =3*2 = 6 sqm
Bottom area = 5*4 = 20 sqm
Mean area =(5+3)/2*(4+2)/2 = 12 sqm
Quantity = 1/6*(6 + 20 +4*12)= 12.33 cum

Is This Answer Correct ?    9 Yes 7 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / sekar.k

QUANTITY CALCULATION FOR TRAPEZOIDAL: 1/2*H(A+B)*L

EXAMPLE:FOOTING TOP WIDTH:2.00M
FOOTING BOTTOM WIDTH:4.00M
FOOTING HEIGHT :6.00M
FOOTING LENGTH :10.00M THEN,
QUANTITY OF TRPEZOIDAL FOOTING :

1/2*H(A+B)*L

1/2*6.00(2.00+4.00)*10.00

1/2*6.00(6.00)*10.00=180.00CUM

Is This Answer Correct ?    5 Yes 4 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / madhu sudhan p

h/3xa1+A2+(SQRTa1xA2)

Is This Answer Correct ?    6 Yes 5 No

Can anybody tell me how to calculate the quantity of a trapezoidal footing?With its formula and an ..

Answer / nadim

divide into 3 parts 1st into 2 traingles and 1 into a rectangle we all know the area formula then multiply the area with the remaining dimension

Is This Answer Correct ?    1 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.

5 Answers  


How can I check the quality of sand,brick,and aggregateat site without using any labouratory test?

1 Answers   CCCL,


Define What is the best type of wood glue?

0 Answers  


WHAT IS THE UDL OF TOWER CRANE?

0 Answers   Hinduja,


How to calculate cement, aggregates for any one grade of concrete for icum?

1 Answers   Megha Constructions, MEIL, Student,






i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

0 Answers  


i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available

0 Answers   Indus Construction,


what do you understand by M25 concrete

0 Answers  


how much wall area covered by 1 kg of lapi(putty)

2 Answers   Jain Group, Ramky,


how many nails required in one sqm shuttering.

1 Answers   BCL, Era Infra Engineering, KR Traders, Sai Foundations,


How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)