Answer / raju
Right formula is = V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE
UNDER A1 A2 ] where , l = length , b = breadth , d = bottom
depth , h = D - d , A1 = bottom area , A2= top area (ii) is
= V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d ,
A1 = bottom area , A2= top area, Am = Mean of Top and Bottom
Area
feel free to call me
Raju
Engineer-Civil
9999213613
DLF
Is This Answer Correct ? | 60 Yes | 3 No |
Answer / raja j
in trapezoidal footing we seperate the footing as two
parts.one is rectangle another is trapezoidal
for taking rectangular portion= (L*B*d)
L=length of footing
B=breath of footing
d=footing depth (at the end of rectangle portion height)
for taking trapezoidal
v=h/3((A1+A2)+sqrt(A1A2))
V=volume
A1= footing area (L*B)
A2= column area+ add 50mm for each side ((l+100)+(b+100))
h=height difference(D-d)
finally,
Add =rectangle+trapezoidal
= (L*B*d)+h/3((A1+A2)+sqrt(A1A2))
Raja.j
9626389621
Is This Answer Correct ? | 9 Yes | 5 No |
Answer / jigar soni
V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / s.prabhu
Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)
Volume of top / slope portion is called as Volume (v2)
V1 = L1xB1xh1
V2= h2/3* (a1+a2)* square root of (a1+a2)
L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2
For any clarification
Please call
S.Prabhu
9901702081
Is This Answer Correct ? | 7 Yes | 4 No |
Answer / krishna kumar.a
Quantity = 1/6*(top area+bottom area+ 4* mean area)
Example
top length =3m, width =2m
bottom length =5m , width =4m
height =1m
Top area =3*2 = 6 sqm
Bottom area = 5*4 = 20 sqm
Mean area =(5+3)/2*(4+2)/2 = 12 sqm
Quantity = 1/6*(6 + 20 +4*12)= 12.33 cum
Is This Answer Correct ? | 9 Yes | 7 No |
Answer / sekar.k
QUANTITY CALCULATION FOR TRAPEZOIDAL: 1/2*H(A+B)*L
EXAMPLE:FOOTING TOP WIDTH:2.00M
FOOTING BOTTOM WIDTH:4.00M
FOOTING HEIGHT :6.00M
FOOTING LENGTH :10.00M THEN,
QUANTITY OF TRPEZOIDAL FOOTING :
1/2*H(A+B)*L
1/2*6.00(2.00+4.00)*10.00
1/2*6.00(6.00)*10.00=180.00CUM
Is This Answer Correct ? | 5 Yes | 4 No |
Answer / nadim
divide into 3 parts 1st into 2 traingles and 1 into a rectangle we all know the area formula then multiply the area with the remaining dimension
Is This Answer Correct ? | 1 Yes | 12 No |
What is the cost of Brickwall ( 4")(1:4) thick wall total Area 245 sqft with plaster(1:6). With all materials including.
How can I check the quality of sand,brick,and aggregateat site without using any labouratory test?
Define What is the best type of wood glue?
WHAT IS THE UDL OF TOWER CRANE?
How to calculate cement, aggregates for any one grade of concrete for icum?
1 Answers Megha Constructions, MEIL, Student,
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what do you understand by M25 concrete
how much wall area covered by 1 kg of lapi(putty)
how many nails required in one sqm shuttering.
1 Answers BCL, Era Infra Engineering, KR Traders, Sai Foundations,
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work