Can anybody tell me how to calculate the quantity of a
trapezoidal footing?With its formula and an example.
Answers were Sorted based on User's Feedback
Answer / raju
Right formula is = V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE
UNDER A1 A2 ] where , l = length , b = breadth , d = bottom
depth , h = D - d , A1 = bottom area , A2= top area (ii) is
= V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d ,
A1 = bottom area , A2= top area, Am = Mean of Top and Bottom
Area
feel free to call me
Raju
Engineer-Civil
9999213613
DLF
Is This Answer Correct ? | 60 Yes | 3 No |
Answer / raja j
in trapezoidal footing we seperate the footing as two
parts.one is rectangle another is trapezoidal
for taking rectangular portion= (L*B*d)
L=length of footing
B=breath of footing
d=footing depth (at the end of rectangle portion height)
for taking trapezoidal
v=h/3((A1+A2)+sqrt(A1A2))
V=volume
A1= footing area (L*B)
A2= column area+ add 50mm for each side ((l+100)+(b+100))
h=height difference(D-d)
finally,
Add =rectangle+trapezoidal
= (L*B*d)+h/3((A1+A2)+sqrt(A1A2))
Raja.j
9626389621
Is This Answer Correct ? | 9 Yes | 5 No |
Answer / jigar soni
V = [L X B X d] + h/6(A1 + A2 + 4 Am) where , h = D - d , A1
= bottom area , A2= top area, Am = Mean of Top and Bottom Area
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / s.prabhu
Please divide the footing in to 2 parts i,e 1) Bottom
rectangular portion & 2)top slope portion
Total volume (V) = v1+v2
Volume of bottom / rectangular portion is called as Volume
(v1)
Volume of top / slope portion is called as Volume (v2)
V1 = L1xB1xh1
V2= h2/3* (a1+a2)* square root of (a1+a2)
L1= length of bottom portion
B1= breadth of bottom portion
h1 = height of bottom portion
L2 = length of top portion
B2= breadth of top portion
h2 = height of top portion
a1= area of bottom bottom Portion = L1*B1
a2 = area of top rectangle portion= L2 *b2
For any clarification
Please call
S.Prabhu
9901702081
Is This Answer Correct ? | 7 Yes | 4 No |
Answer / krishna kumar.a
Quantity = 1/6*(top area+bottom area+ 4* mean area)
Example
top length =3m, width =2m
bottom length =5m , width =4m
height =1m
Top area =3*2 = 6 sqm
Bottom area = 5*4 = 20 sqm
Mean area =(5+3)/2*(4+2)/2 = 12 sqm
Quantity = 1/6*(6 + 20 +4*12)= 12.33 cum
Is This Answer Correct ? | 9 Yes | 7 No |
Answer / sekar.k
QUANTITY CALCULATION FOR TRAPEZOIDAL: 1/2*H(A+B)*L
EXAMPLE:FOOTING TOP WIDTH:2.00M
FOOTING BOTTOM WIDTH:4.00M
FOOTING HEIGHT :6.00M
FOOTING LENGTH :10.00M THEN,
QUANTITY OF TRPEZOIDAL FOOTING :
1/2*H(A+B)*L
1/2*6.00(2.00+4.00)*10.00
1/2*6.00(6.00)*10.00=180.00CUM
Is This Answer Correct ? | 5 Yes | 4 No |
Answer / nadim
divide into 3 parts 1st into 2 traingles and 1 into a rectangle we all know the area formula then multiply the area with the remaining dimension
Is This Answer Correct ? | 1 Yes | 12 No |
What is the design mix? What is the proportion for M25, M35, M40 concrete mix.
9 Answers ACC, DBM, Era Infra Engineering, Thakural Constructions,
cement mortar 1:6 explain the cement and sand coefficient calculation?
how to identify the failure of building by expansive soils
what is difference between tor steel & TMT STEEL?
1) what is the seewage discharge per person per day taken for design purpose as per IS codes? 2) how to convert gauge to MM like if we measure 18G as our door frame then how much is it in MM ? 3) how much binding wire is required ti tie 100kg steel ? 4) while making rings in steel reinforcement , whether the corners of rings are deducted to take out cutting length ? 5) how much carbon content should be there in steel used for construction purpose? 6) what are fe415 & fe 500 and which bars are used in general civil works?
Advantages and Disadvantages of using fly ash bricks over clay bricks?
11 Answers Pradhi Engineering,
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
what is thickness of NP2 hume pipe?
does the compressive strength of brick be more then 3.5 n/mm2 or 5 n/mm2?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
For what building Built-on balconies are preferable? What are the advantages?
18. What is the thing that might make you happy at your work place?