Dear Friends am S.PRABHU looking for job chnage i have
wonderfull exposure to both Construction works & i have a
experience 11 years if any found any suitable opening,
please Contact 9986539249
Answer / prabhu154
Dear Friends am S.PRABHU looking for job chnage i have
wonderfull exposure to both Construction works & i have a
experience 11 years if any found any suitable opening,
please Contact 9986539249
| Is This Answer Correct ? | 0 Yes | 2 No |
The designs required to construct a building are ––
In earth work 1300 cum soil how to calculate how many liters require in water
Give me the name of type of slabs?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what energized you to complete your course?
the minimum percentage of steel for 2m rcc slab
what is thickness of NP2 hume pipe?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
Is there any software to prepare the Estimate of building.Plz tell me.......
can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz
In a slab where does the Uniformly Distributed Load (UDL) act?
what is the logical concrete mix design for M 30 Grade and the cement consumption per M3
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)