Dear Engineers,
Can you please advise me the material requirement to construct a room 4 M x 4 M
1. No. of Standard Brick
2. Requirement of Cement Bags
3. And Concrete for Steel, Cement, sand, etc
Thanks
No Answer is Posted For this Question
Be the First to Post Answer
How do you calculate the power of centrifugal pump?
1:6 mortar, how many self life hours ?
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What is Lap Length??????
1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?
what is the functional requirement of cement plaster in RCC members & masonry?? Is it Manditory to do plastering on all RCC members(beams, Columns, Slabs)? in what places plasterring could be kept as an optional one???
What is the strength of concrete with ratio 1:4:8 as per British standard or ACI
why the horizontal crack occoured in the joint between brick work and lintel?pls. give clarification???
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
may i know the detailed description of cutting length
what is the use of bottom reinforcement in Cantilever Beam?