Dear Engineers,
Can you please advise me the material requirement to construct a room 4 M x 4 M
1. No. of Standard Brick
2. Requirement of Cement Bags
3. And Concrete for Steel, Cement, sand, etc
Thanks
No Answer is Posted For this Question
Be the First to Post Answer
The mixture of different ingredients of cement is burnt at?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How much is the curing time period?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
How do we say The LAP LENGHT is 50D to 60D ?????
first wt is reqd. for making a mix design of concrete & the procedure of determining the qty. of material used in concrete.
which grade of concrete according to Indian Standard 800:2007 has highest strength?
How can I make justification between using concrete grade c35 compare c37?
What does a construction cost covers and what does not?
what"s the cement, sand, aggregate(consumption) quantity for 10 cm thick roof slab (1:2:4)
What are the tests to be conducted on cement?
What is the basic difference between OPC
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)