Before casting a basement roof slab which is connected with
retaining wall surcharge load (i.e. sand or earth
filling) outside the retaining wall is prohibited because
of––
No Answer is Posted For this Question
Be the First to Post Answer
What does civil engineering mean?
WHAT IS IS CODE FOR USE TOR & TMT STEEL
What are the types of test used to determine soil bearing capacity
which graph is used for getting target strength relationship
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
how many type of admixtures for water stored structure?
How much steel required in 1 square feet slab?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
why canot DBM is continue as surface coarse insted of BC? what is dieefrence between DBM & BC?
what is pH value of sewage&water.if pH value is given then how to calculate H+.
hi i am kailash we construction start a slab load baring 40feet *9 feet *4 inch plz suggest matarials and qty
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)