Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answers were Sorted based on User's Feedback
Answer / v.kapil
Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.
| Is This Answer Correct ? | 15 Yes | 0 No |
Answer / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
| Is This Answer Correct ? | 3 Yes | 3 No |
Answer / saif raza
As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
| Is This Answer Correct ? | 6 Yes | 8 No |
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
Rate analysis of painting
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
What is the difference between M20 and M25 concrete?
3 Answers CSC, Focus Energy, ME,
What is mean by Engineers ?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?
what"s the abbreviation for P.C.C? what"s the formula to calculate 1m3 P.C.C consumption?
2 Answers ACIL, L&T, Punj Lloyd Ltd, Rajshree Construction,
how to calculate rate analysis of M25 grade concrete
8 Answers Nagarjuna Construction, Simplex,
what opc & ppc cement $ composition?
16. What do you consider to be your greatest achievement so far and why?
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)