Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answers were Sorted based on User's Feedback
Answer / v.kapil
Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / saif raza
As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
Is This Answer Correct ? | 6 Yes | 8 No |
Full from of ACC
What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
What Is the meaning of M15 and M20
How to ascertain the required grade of Steel is good for Site .....
what is civil all interview questions
Maximum foundation pressure under PRCC box is 19 T/Sqm and net safe bearing capacity is 12.65. Is it safe? pl help me
Would you cause a 55-gallon drum of water to weigh more by climbing in?
how to calculate the steel in 500yard
Explain your project management?
2 Answers HNB Engineers, Shell,
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).
For Wet Mix Mecadam design what is Optimum moisture content