Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answers were Sorted based on User's Feedback
Answer / v.kapil
Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.
Is This Answer Correct ? | 15 Yes | 0 No |
Answer / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / m.haseeb yaquobi
becuase it reache more then 50% of its full strenght
Is This Answer Correct ? | 3 Yes | 3 No |
Answer / saif raza
As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
Is This Answer Correct ? | 6 Yes | 8 No |
1.How much strength will be attained for M30 grade of concrete after 28 days? 2.Is it attain 30 N/mm2 or target mean strength?
Types os Water proofing?
Plese tell me about cranked beam (end hook lenth, crank angle, crank length). Thanks.
how we can design the design mix(m25)
what is the meaning of degreasing of the euipment or line.
What do you meant by gui?
What is softsoil? what kind of foundation?
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????
which is the cheapest type of temporary flooring(say for using 6 months on)?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
brickwork labour rate per cum ?
what is a pitot tube