Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answer Posted / ashok kumar chaudhary
Dear Sir,
SOLUTION :-
=((LxBxd)+(LxBxD/2))M3
Here L=2.0M
B=1.7M
d=0.15M
D=0.50M
((2.0x1.7x0.15)+(2.0x1.7x(0.50-0.15)/2))
=((0.51)+(3.4x(0.35/2))
=((0.51)+(0.595))
=1.105 M3 Ans.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the difference b/w full length and cutting length?
In cement making,what is meaning of blend,fineness,density.
How many square meter can a worker/labor demolish a structure per day?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
What do we mean by partial moment release ??
how many kg of 20mm, 10mm, dust available in one ton stone boulder
What is meaning of FREE STANDING STAIRCASE ?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
For what building Built-on balconies are preferable? What are the advantages?
what do you understand by M25 concrete
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What are the benefits of rcc pipes over steel designed pipes?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
what is the clear cover for shearwall?